GRID: 415V 50Hz NORMAL | MODBUS RTU/TCP: 1.2ms [ACTIVE] | HARMONICS: < 1.4% THD | UTC 00:00:00
Home / Projects / Automated Feed Mill Batching & SCADA Historian
Agro-Industrial & Milling

Automated Feed Mill Batching & SCADA Historian

Factory Automation & SCADA Haiwell Modular PLC • 10.1" HMI • SQL Database

Engineering Challenge & Overview

Complete automation of 20-bin raw material intake, pneumatic slide gates, micro-ingredient loss-in-weight dosing, and dual ribbon mixer sequencing.

System Architecture & Result

The system achieved 100% target operational throughput within the first 48 hours of live production commissioning. Noise-immune shielded cabling and proper surge arrestors protect against high-voltage surges and industrial EMI interference.

Inquire About Similar Project